The most important specifications of different loading methods are:
Loading Method | Loading speed in 24 hours | Maximum capacity of transport vessel | Remarks |
---|---|---|---|
Bulk clinker into ship Fresh Clinker | 15000 tons | Up to 60,000 tons Ship | Clinker transition via conveyor belt directly from clinker reserve silo into ship |
Bulk clinker into ship Clinker From open warehouse | 12000 tons | Up to 60,000 tons Ship | Loading clinker from open warehouse on the last section of conveyor belt using loader trucks → Clinker transition via conveyor belt into ship |
Bulk cement into ship | 5000 tons | Up to 30,000 tons Ship | Loading cement bunkers from cement reserve silo → pumping into ship |
Bulk cement into ship | 6000 tons | 25 ton- bunker | Loading cement bunkers from cement reserve silo |
Bag cement into truck | 2000 tons | 25 ton- truck | Loading via and labor |
Bulk cement in jumbo bags into ship | 3000 tons | 25 ton- truck | Jumbo bag loading from cement reserve silo →loading on truck → transfer of jumbo bag with crane on ship |
Bag cement in jumbo bags into ship | 1500 tons | 25 ton- truck / Up to 30,000 tons Ship | Packing station and labor |